Technical Data
| Technical Data of the IKL Pipeline | |
|---|---|
| Total pipeline length (Vohburg an der Donau – Central Crude Oil Tank Farm in Nelahozeves): | 347,4 km |
| Pipeline length in the CR: | 168,6 km |
| Transport capacity: | 10 million tons of oil per year |
| Pipeline capacity: | Approx. 140 000 m3 |
| Oil speed in pipes: | Approx. 0.5 – 1.2 m/s |
| Pipe diameter: | DN 700 |
Press release
Oil supplies through the Druzhba pipeline